Waste Flow
Construction and demolition waste (CDW)

Impact on PESTEL categories
Technological, Environmental, Legal

Location of the good practice
Metropolitan Areas of Naples

Stakeholders involved
Campania Region Authority, researchers, constructor companies, demolition companies, waste managers

Keywords
Sustainability of buildings, Improving waste logistics, Quality management

Description
This solution is part of the Beyond INERTia Strategy: circular supply chain for CDW. Selective demolition is very expensive compared to traditional demolition. The SELECT solution is a public incentive for companies that operate selective demolitions through the separation of components, and the separation of non-recyclable materials from recyclable ones.

Objective
The objectives of selective demolition are mainly related to the prevention of CDW production. The strip out allows reuse, and the selection of waste materials to be recycled allows to produce a production value chain for the construction industry. In Campania Region, this solution would enable the regional indications of the 2013 waste prevention plans.

Pictures
SELECTive demolition as part of Beyonf INERTia Strategy: the EISs for CDW in Naples case study.

The circular diagram show synergies of eco-innovative solutions in a circular CDW management.

For further information
https://h2020repair.eu/wp-content/uploads/2019/10/Deliverable-5.3-Eco-Innovative-Solutions-Naples.pdf (page 62)

Download in .pdf